Cleaning a
building after the pigs leave
|
1 |
Pigs leave the building |
|
2 |
Remove all faeces, left feed, bedding and other easily removed materials |
|
3 |
Compost all of the removed materials |
|
4 |
Wash water down over all the surfaces |
|
5 |
Leave for 30 minutes |
|
6 |
Examine the outside area |
|
7 |
Remove all faecal materials from the outside area |
|
8 |
If the outside area has been dug up, replace the soil as required. |
|
9 |
It may be necessary to turn-over the soil surface |
|
10 |
Repair the wallow area if required. Drain if possible and allow to dry |
|
11 |
After allowing the floor area 30 minutes to soak |
|
12 |
Brush the floor thoroughly with hot/warm water with soap added to the water |
|
13 |
Clean thoroughly the floor, bedded area, feeders and waterers |
|
14 |
Allow the floor to dry |
|
15 |
Examine the building and repair where necessary |
|
16 |
Make up lime-wash – 3:1 Calcium carbonate |
|
17 |
Wash all the floor and wall surfaces to 1 metre high with lime wash |
|
18 |
Allow the floor to dry |
|
19 |
The new pigs are not to enter the building until the lime wash is totally dry – minimum 24 hours |

Successful pig farming – batch after batch